Solar planning · United States

Solar panel requirement calculator

Get a first-pass DC system size before you talk to installers. Pick your state to set a better peak-sun-hours starting point. For production modelling, tools like NREL PVWatts remain the reference — this page shows the sizing identity clearly.

National blend only — pick your state for a better starting point.

Peak sun hours follow the selected state/region. Orientation, shading and weather still change real output.

Results

Required array (nominal)
—
Installed capacity
—
Estimated panels
—
Est. daily production
—
Est. monthly production
—

Methodology

Required array kW ≈ daily kWh ÷ (peak sun hours × performance factor × (1 − shading loss)). Panel count = ceil(array kW × 1000 ÷ panel watts). Estimated production = installed kW × peak sun hours × effective performance factor.

Worked example

20 kWh/day, 4.5 peak sun hours, 0.77 performance factor → array ≈ 20 ÷ (4.5 × 0.77) ≈ 5.77 kW. With 400 W panels that is about 15 panels before roof limits.

Assumptions and limitations

No shade, snow, soiling, azimuth or temperature model. Does not include incentives, net metering or interconnection limits.

Nominal installed capacity is not the same as expected generation. Confirm main-panel and interconnection capacity with a professional before oversizing for EVs or future loads.

FAQ

Is this the same as PVWatts?

No. PVWatts simulates hourly weather. This calculator uses a simple daily energy balance for quick planning.

Should I oversize for future EV charging?

You can raise daily kWh to include charging. Confirm main-panel and interconnection capacity with a professional.

Do incentives change panel count?

Incentives affect payback, not the physical energy balance. Do not hardcode incentive assumptions without a current verified source.

Related calculators

All United States calculators · Guides for United States

Sources and review

array_kW ≈ daily_kWh ÷ (PSH × performance_factor). Location PSH values are illustrative.